| 1. | You can reschedule one, multiple or all services on the PM Schedule. |
| a. | To reschedule one service, click on the service in the selection grid to highlight it. |
| b. | To reschedule multiple services, select the checkboxes next to the services you want to reschedule. |
| c. | To reschedule all services, you do not need to select any. |
| 2. | Click the PM Options button in the upper right corner and select Reschedule. |
| 3. | In the Reschedule Options dialog, choose whether you want to reschedule Current (the service currently highlighted in the selection grid), Selected or All services, and click OK. |
| 4. | The Reschedule Information dialog appears. If you are rescheduling multiple services, or a single Time-cycle service, you will only be able to reschedule by Date. If you are rescheduling a single service with a Cycle Type of Meter or Meter and Time, you can select a radio button to indicate whether you want to reschedule by Date or Meter. |

| 5. | Select the Date or enter the Meter to which this service is rescheduled and click OK. |
| 6. | If you reschedule by Date, the Scheduled Date of the service will be locked at the date you choose here and the lock level of the service will be changed to Full Lock. If you reschedule by Meter, the service will be locked into occurring at the Meter you set here and the lock level of the asset service will be set to Meter Lock. |
|